Technical data

  • Location: Austria
  • Year of construction: 1988
  • Year of refurbishment: 2025
  • Net head: 212 m
  • Flow rate: 400 l/s
  • Output per unit: 722 kW

Scope of delivery: Renewal and refurbishment of a Pelton turbine; implementation of a hydraulic jet actuator, renewal of the nozzles, the corrosion protection, the generator, and the turbine control system; delivery and commissioning of the mechanical and electrical equipment for the water intake.