Breitenlehenbach
Refurbishment
Technical data
- Location: Austria
- Year of construction: 1988
- Year of refurbishment: 2025
- Net head: 212 m
- Flow rate: 400 l/s
- Output per unit: 722 kW
Scope of delivery: Renewal and refurbishment of a Pelton turbine; implementation of a hydraulic jet actuator, renewal of the nozzles, the corrosion protection, the generator, and the turbine control system; delivery and commissioning of the mechanical and electrical equipment for the water intake.
Before vs. after
On the left side you can see the initial condition of the turbine before the revitalisation. On the right you can see a picture of the renewed and refurbished turbine.