1896
Establishment of a company
It all began in 1896, when Karl Geppert (1867-1918) purchased a property on Breitweg in Hall in Tyrol and founded the Geppert company there. Since then, concepts for the efficient use of hydropower have been developed and successfully implemented with the aim of using this proven energy source as the energy of the future.
1896
Establishment of a company
It all began in 1896, when Karl Geppert (1867-1918) purchased a property on Breitweg in Hall in Tyrol and founded the Geppert company there. Since then, concepts for the efficient use of hydropower have been developed and successfully implemented with the aim of using this proven energy source as the energy of the future.
1950
Hightech made in Austria
Josef Geppert (1905-1994) set a milestone back in the 1950s with the development of the robust oil-hydraulic turbine speed governor.
1950
Hightech made in Austria
Josef Geppert (1905-1994) set a milestone back in the 1950s with the development of the robust oil-hydraulic turbine speed governor.
1982
Full automation of hydropower plants
In 1982 Wilfried Geppert (born 1945) implemented the first programmable logic controllers for hydropower stations. This led to full automation of the hydropower plants – another mainstay for the reliable generation of clean green electricity was established.
1982
Full automation of hydropower plants
In 1982 Wilfried Geppert (born 1945) implemented the first programmable logic controllers for hydropower stations. This led to full automation of the hydropower plants – another mainstay for the reliable generation of clean green electricity was established.
2007
4th generation
With pride in its domestic know-how in turbine construction, family Geppert is developing forward-looking energy solutions in fourth generation with Mag. Guntram Geppert (born 1969).
2007
4th generation
With pride in its domestic know-how in turbine construction, family Geppert is developing forward-looking energy solutions in fourth generation with Mag. Guntram Geppert (born 1969).
2016
Expansion of the company location of Geppert Group Holding GmbH
In September 2016, the family Geppert took a major step forward in its ongoing development: at the location in Hall in Tyrol, already established as a global centre, a generously dimensioned office building including a completely newly equipped production hall and warehouse was constructed at Geppertstrasse 6. On a floor space of more than 10,000 m², highly trained specialists and state-of-the-art machines are at work. The complete supply of the company building is covered by regenerative energy sources. In the interest of renewable energies. To preserve an environment worth living in.
2016
Expansion of the company location of Geppert Group Holding GmbH
In September 2016, the family Geppert took a major step forward in its ongoing development: at the location in Hall in Tyrol, already established as a global centre, a generously dimensioned office building including a completely newly equipped production hall and warehouse was constructed at Geppertstrasse 6. On a floor space of more than 10,000 m², highly trained specialists and state-of-the-art machines are at work. The complete supply of the company building is covered by regenerative energy sources. In the interest of renewable energies. To preserve an environment worth living in.
2023
Establishment of Geppert Hydro GmbH
By establishing of Geppert Hydro GmbH, another future-oriented milestone was initiated in the advancement and specialization in the direction of hydropower applications.
2023
Establishment of Geppert Hydro GmbH
By establishing of Geppert Hydro GmbH, another future-oriented milestone was initiated in the advancement and specialization in the direction of hydropower applications.
Today
Professional, not usual
We are proud of our domestic engineering skills, and as a turbine manufacturer we now supply countries all over the world with innovative and customized power plant solutions featuring 5 different types of turbines. All water turbines and plants are designed, developed, built and carefully tested at the Geppert Group Holding Headquarter in Hall in Tyrol, using world-leading engineering skills.
Today
Professional, not usual
We are proud of our domestic engineering skills, and as a turbine manufacturer we now supply countries all over the world with innovative and customized power plant solutions featuring 5 different types of turbines. All water turbines and plants are designed, developed, built and carefully tested at the Geppert Group Holding Headquarter in Hall in Tyrol, using world-leading engineering skills.
Tomorrow
Solutions of tomorrow - TODAY
Geppert is already in the process of developing the energy supply strategies of tomorrow in order to supply a growing number of people with sustainable and clean energy from hydropower. Geppert‘s innovative solutions will safeguard our climate and our environment through the use of renewable, climate-neutral and emission-free hydropower. Today‘s hydropower plants will be delivering electricity for decades to come.
Tomorrow
Solutions of tomorrow - TODAY
Geppert is already in the process of developing the energy supply strategies of tomorrow in order to supply a growing number of people with sustainable and clean energy from hydropower. Geppert‘s innovative solutions will safeguard our climate and our environment through the use of renewable, climate-neutral and emission-free hydropower. Today‘s hydropower plants will be delivering electricity for decades to come.