Commissioning of hydropower plant Sarmenitiko

We are especially pleased to announce that another “Water-to-Wire” project in Southeastern Europe has been planned, equipped, and successfully commissioned by Geppert Hydro.

The plant consists of a Geppert Hydro Pelton turbine and has a mechanical output of 1.35 MW.

Technical data

Technical data

  • Turbine type: Pelton Turbine
  • Quantity: 1
  • Location: Greece
  • Year of construction: 2025
  • Net head: 263 m
  • Flow rate: 575 l/s
  • Total output: 1,345 kW

Scope of delivery: Pelton turbine, generator, inlet pipe, main shut-off device, hydraulic power unit, automation and control technology, medium-voltage switchgear, main and self-consumption transformer

Sarmenitiko